A multi-year scientific data acquisition tower was erected on an
offshore US site. Woods Hole Group designed, installed, and acquired
real time data from the site. The sensor package included multi-level
wind speed and direction, multi-level temperature and barometric
pressure, and sub-sea wave height and direction along with current
speed and direction. All data was synthesized on site, stored locally,
and also real time transmitted to Woods Hole Group for processing
and data reporting. Project Management tasks included all customer
liaison, contract negotiation; data report review, and technical
oversight of the entire scientific package.
Real Time Meteorological & Oceanographic Data System/International
Oil Rig Project Manager
Woods Hole Group was responsible for the design and implementation
of a real time, deep-water (5,000 ft) data acquisition system on
a multi-platform spread for an international oil drilling operation.
Dual Acoustic Doppler Current Profiling instruments along with wind
speed and direction data were synthesized into a central data information
management system onboard the drilling rig. Project Management included
specification control documentation, contract negotiations; technical
specifications for purchased equipment, system documentation, logistical
support, and customer relations.
Real Time Met-Ocean Data Program NOAA Project Manager
A multi-year, multi site contract to oversee the operation and maintenance
of the NOAA PORTS operations in Chesapeake Bay, Delaware River,
and Narragansett Bay. The NOAA PORTS (Physical Oceanographic Real
Time System) acquires and disseminates wind, wave, current, tidal,
conductivity, and temperature parameters to public websites. The
Woods Hole Group, as prime O&M contractor is responsible for
the daily operational status of 32 stations in these three regions.
Project Management tasks included contractual negotiations, contract
compliance, day to day management of service tasks for call out
work, and emergency service call out work to maintain system operational
status.
Mobil Drilling Unit Met-Ocean Data Acquisition Program
Project Manager
Multiple International Oil Company installations of Acoustic Doppler
Current Profiler (ADCP) instrumentation along with meteorological
instrumentation to monitor current induced stresses on oil exploratory
and production drilling operations in deep water. Projects were
based in Australia, Brazil, and West Africa. Project Management
responsibilities included proposal presentation, contract negotiations,
contract compliance for all issues including health and safety,
and logistical support for daily operations.
International Remediation Programs Kingdom of Saudi Arabia
Project Manager
Site investigations and data compilation for a major environmentally
impacted region in the Kingdom of Saudi Arabia for remediation and
restoration of the environment. Spilled oil from the 1991 Gulf War
and the damage to the desert ecosystems associated with the military
operations in the deserts of the northeastern portion of the Kingdom
of Saudi Arabia have created a lingering health and environmental
problem. Three major environments were involved: coastal shorelines,
terrestrial deserts, and sub-tidal regions. Project Management responsibilities
included in-country contract implementation with sub-contractors,
in-country logistical support, detailed RTK GPS Geodetic Surveying,
contract compliance, overall logistic support, and reporting/documentation
tasks.
Pre Construction Survey, Kuwait, Resident Project Manager.
A one year environmental
assessment study of the onshore geological conditions and offshore
oceanographic conditions to determine the optimal location of a
new power plant. The study included geotechnical investigations
and meteorological conditions on land, and a near shore ocean circulation
patterns studies to optimize the intake and discharge cooling water
structures for the new power plant. Detailed bathymetric studies
were performed as well as sediment transport studies.
Pre Construction Surveys,
Columbia, South America, Resident Project Manager.
A 9 month environmental
assessment study with offshore geological and geophysical studies to determine
the optimal location for new coal export terminal.
Site Survey, Egypt, Resident
Project Manager.
A three month project to
determine the cost to renovate an existing Egyptian Navy base as a new
forward development base for the US Forces. Detailed bathymetric
studies, onshore site surveying, bathymetric and geophysical investigations
to determine alternate routes of approach.