Assessment of Remediation Technologies for Cleanup of Oiled Shorelines, Tide Flats, and Salt Marshes Within the Kingdom of Saudi Arabia
Project Characteristics:
    • Assessment of environmental damage to beaches, tide flats, & marshes from the 1991 Gulf oil spill
    • Laboratory assessment of aerobic & anaerobic oil remediation methodologies
    • Germination & survivability tests of native marsh species in contaminated soils
    • Field scale demonstration of marsh restoration
    • Field scale demonstration of oil remediation techniques
    • Environmental Impact Assessment
    • Development of full scale remediation strategy
 
aea02-166-01







aea02-166_02

Woods Hole Group, Inc., under contract to the Environmental Consulting Bureau of the Kingdom of Saudi Arabia (KSA), conducted a field demonstration of oil remediation techniques applicable to arid environments. Approximately 750 km of shoreline within the Kingdom of Saudi Arabia along the Arabian Gulf were impacted as a direct result of the 1991 Gulf War.

The area covered in this field study extends along the KSA Arabian Gulf shore from the Kuwait border to the industrial city of Al-Jubail. This complex shoreline is composed of an interlaced series of tide flats, beaches, embayments, and salt marshes. Much of these ecosystems remain severely impacted from the oil spill.

The Remediation Technology Assessment (RTA) was designed to follow a logical, sequential series of steps representing international protocol for conducting remediation technology evaluations that relied heavily on approaches developed by the United States Environmental Protection Agency (U.S. EPA). Utilizing this approach assured that the designed approach was credible, complete, replicable, and reliable.

The major steps in the RTA conduct included:
  • Literature survey of remediation technologies
  • Design and review of laboratory-scale remediation trials
  • Conduct of laboratory-scale remediation trials
  • Design and review of field-scale remediation trials
  • Conduct of a baseline environmental study of the field-scale trial demonstration sites
  • Conduct of field-scale remediation trials
  • Post-demonstration environmental impact assessment of field-scale trial sites
  • Final review and assessment of field and laboratory trials
  • Interaction between RTA and Ecological Risk Assessment to determine environmental risks associated with various remediation technology options.
  • Recommendations to the Client of considerations for implementing full scale remediation

This sequential design was followed in a general sense, but the accelerated schedule associated with the UNCC damage claims process required constant amendments to the scheduling of these various tasks.

Lack of availability of some equipment locally also affected the ability of the field trials to be carried out as designed; modification to the field trial operations plan was required nearly daily to respond to lessons learned during the previous work. However, all tasks were completed successfully on schedule. The laboratory-scale trials provided important conclusions for the field-scale trials. Laboratory studies included:
  • Assessment of anaerobic biodegradation in petroleum-contaminated sediments
  • Assessment of aerobic biodegradation in petroleum-contaminated sediments
  • Assessment of germination of Salicornia in petroleum contaminated sediments
  • Assessment of thermal treatment for petroleum contaminated sediments
The field-scale trials provided important conclusions for the full-scale remediation of the coastal zone. Field trials spanned a series of materials handling trials, as well as clean-up trials. Remediation trials included:
  • Tilling and perforations
  • Excavation
  • Rock removal
  • Rock breaking and fracturing
  • Removal of tar mats
  • Berming
  • Restoring tidal channels
  • Restoring microtopography
  • Planting for revegetation trials

Extensive work on materials handling was conducting, both in the field and in consolidated materials handling yard. Requirements for transportation, for separation, for handling were all tested in the field. Recommendations for effective use of each of these techniques were developed and are presented to the Client.

Unit costs for all work also were developed based on the field trials. Although large-scale remediation will present certain economies of scale, the mixture of high technology (HTTD) and low technologies required the development of a complex costing matrix to estimate and control costs.

Location: Kingdom of Saudi Arabia Eastern Province
Client:

Environmental Consulting Burea

Contact:

Abraham Jacob

Telephone:

011 966 3 857 9859


 
titlebar1.gif (6583 bytes) Woods Hole Group offers customized Capabilities for each client and assignment. 
titlebar2.gif (7189 bytes) Woods Hole Group has experienced Scientists and Engineers involved in solving environmental problems. 
titlebar3.gif (6244 bytes) Woods Hole Group provides consulting
services and products to
Clients throughout the world. 

 
Coastal Sciences, Engineering & Planning topicbar2.gif (1538 bytes)
Environmental Laboratories topicbar3.gif (1508 bytes)
Aquatic Environmental Assessment topicbar4.gif (1571 bytes)
Oceanography & Measurement Systems topicbar5.gif (1515 bytes)

 
For more information please call or e-mail the
Vice President of Business Development:
Robert P. Hamilton Jr. at 508-495-6229
bhamilton@whgrp.com
or  Senior Scientist & Senior Oceanographer: 
Bruce A. Magnell at (508) 495-6223 
bmagnell@whgrp.com

 
depbar1.gif (3881 bytes) depbar2.gif (2710 bytes) depbar3.gif (3992 bytes) depbar4.gif (3031 bytes) depbarnews.gif (5881 bytes)
home.gif (5555 bytes) Woods Hole Group
Marine Environmental Solutions
81 Technology Park Drive, East Falmouth, MA 02536
Tel: 508-540-8080   Fax:508-540-1001
© 2002-2003, Woods Hole Group, Inc.